Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP GLAND
Switzerland · official identifier CH_WWTP_572100
35,000h-e design capacity (2022) · 116th of 705 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_572100 · reported size 35,000 h-e design capacity · received load 32,512 h-e · reported treatment: PST · data year 2022. 116th of 705 records with reported size in the inventory of Switzerland (tied with 3 others); 0.21 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.7 km · 8 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.4259, 6.2947 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 32,512 p.e. of reported load; equivalent average load 36,706 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (10,957 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Prangins | 4.7 km | 3,600 | 4,254 | primary, secondary and tertiary |
| Rolle | 5.5 km | 34,250 | 11,906 | primary, secondary and tertiary |
| Nyon | 6.6 km | 50,000 | 32,186 | primary, secondary and tertiary |
| Perroy | 7.5 km | 4,375 | 3,888 | primary, secondary and tertiary |
| Allaman | 8.2 km | 625 | 472 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP GLAND report?
Reported size: 35,000 h-e design capacity. Received load: 32,512 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of GLAND?
Aguas SB simulator reference scenario for 32,512 p.e. of reported load: 1,714,518 kWh per year (46.7 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.