Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP GUERBETAL (KAUFDORF)
Switzerland · official identifier CH_WWTP_086900
26,500h-e design capacity (2022) · 151st of 705
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_086900 · reported size 26,500 h-e design capacity · received load 11,689 h-e · reported treatment: PST · data year 2022. 151st of 705 records with reported size in the inventory of Switzerland; 0.16 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.1 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.8439, 7.5032 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 11,689 p.e. of reported load; equivalent average load 13,196 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (3,939 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Muensingen | 5.1 km | 30,000 | 14,447 | primary, secondary and tertiary |
| Kiesental Unteres | 5.9 km | 13,000 | 7,453 | primary, secondary and tertiary |
| Rueggisberg/Hinterf. | 7.9 km | 238 | 47 | primary, secondary and tertiary |
| Kiesental Oberes (Konolfingen) | 9.6 km | 18,750 | 11,860 | primary, secondary and tertiary |
| Thunersee | 10.1 km | 200,000 | 127,131 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP GUERBETAL (KAUFDORF) report?
Reported size: 26,500 h-e design capacity. Received load: 11,689 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of GUERBETAL (KAUFDORF)?
Aguas SB simulator reference scenario for 11,689 p.e. of reported load: 667,008 kWh per year (50.5 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.