Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP KILLWANGEN
Switzerland · official identifier CH_WWTP_403000
31,654h-e design capacity (2022) · 131st of 705
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_403000 · reported size 31,654 h-e design capacity · received load 29,127 h-e · reported treatment: PST · data year 2022. 131st of 705 records with reported size in the inventory of Switzerland; 0.19 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.2 km · 12 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.4341, 8.3546 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 29,127 p.e. of reported load; equivalent average load 32,884 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (9,816 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Otelfingen | 3.2 km | 7,700 | 6,963 | primary, secondary and tertiary |
| Dietikon(Limmattal) | 4.4 km | 110,000 | 103,463 | primary, secondary and tertiary |
| Buchs(Furthof) | 5.4 km | 10,000 | 12,788 | primary, secondary and tertiary |
| Stetten | 6.2 km | 15,408 | 14,669 | primary, secondary and tertiary |
| Mellingen | 7.0 km | 26,473 | 25,095 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP KILLWANGEN report?
Reported size: 31,654 h-e design capacity. Received load: 29,127 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of KILLWANGEN?
Aguas SB simulator reference scenario for 29,127 p.e. of reported load: 1,571,176 kWh per year (47.8 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.