WWTP LAVEY-ST-MAURICE
Switzerland · official identifier CH_WWTP_540600
10,000h-e design capacity (2022) · 276th of 705 (tied with 10 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_540600 · reported size 10,000 h-e design capacity · received load 6,024 h-e · reported treatment: PST · data year 2022. 276th of 705 records with reported size in the inventory of Switzerland (tied with 10 others); 0.06 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.2 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.2172, 7.0095 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 6,024 p.e. of reported load; equivalent average load 6,801 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,030 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Bex | 3.2 km | 9,625 | 6,699 | primary, secondary and tertiary |
| Evionnaz | 4.8 km | 9,000 | 5,693 | primary, secondary and tertiary |
| Monthey-Cimo | 5.5 km | 360,000 | 276,955 | primary, secondary and tertiary |
| Troistorrents | 6.5 km | 13,417 | 5,097 | primary, secondary and tertiary |
| Gryon | 7.5 km | 6,250 | 1,397 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LAVEY-ST-MAURICE report?
Reported size: 10,000 h-e design capacity. Received load: 6,024 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of LAVEY-ST-MAURICE?
Aguas SB simulator reference scenario for 6,024 p.e. of reported load: 354,683 kWh per year (52.2 kWh per p.e. of average load), with aeration as 40 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.