Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP ORPUND
Switzerland · official identifier CH_WWTP_074600
20,400h-e design capacity (2022) · 182nd of 705
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_074600 · reported size 20,400 h-e design capacity · received load 11,039 h-e · reported treatment: PST · data year 2022. 182nd of 705 records with reported size in the inventory of Switzerland; 0.12 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.4 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.1399, 7.3246 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 11,039 p.e. of reported load; equivalent average load 12,462 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (3,720 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Lyss | 5.4 km | 85,000 | 48,930 | primary, secondary and tertiary |
| Biel | 5.6 km | 140,000 | 117,832 | primary, secondary and tertiary |
| Grenchen(Buerenamt) | 7.8 km | 67,500 | 47,114 | primary, secondary and tertiary |
| Bibern | 10.7 km | 375 | 216 | primary and secondary |
| Messen(Limpachtal) | 10.7 km | 12,000 | 5,026 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ORPUND report?
Reported size: 20,400 h-e design capacity. Received load: 11,039 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of ORPUND?
Aguas SB simulator reference scenario for 11,039 p.e. of reported load: 630,804 kWh per year (50.6 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.