Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP OSSINGEN
Switzerland · official identifier CH_WWTP_003701
3,000h-e design capacity (2022) · 418th of 705 (tied with 5 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_003701 · reported size 3,000 h-e design capacity · received load 1,977 h-e · reported treatment: PST · data year 2022. 418th of 705 records with reported size in the inventory of Switzerland (tied with 5 others); 0.02 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.4 km · 10 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.6103, 8.7191 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,977 p.e. of reported load; equivalent average load 2,231 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (666 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Thalheim(Guetighausen) | 2.4 km | 1,600 | 1,437 | primary, secondary and tertiary |
| Andelfingen | 3.7 km | 10,000 | 7,625 | primary, secondary and tertiary |
| Unterstammheim(Stammertal) | 5.3 km | 3,500 | 1,571 | primary, secondary and tertiary |
| Altikon | 5.4 km | 1,100 | 1,006 | primary and secondary |
| Marthalen(Weinland) | 6.1 km | 5,000 | 3,250 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP OSSINGEN report?
Reported size: 3,000 h-e design capacity. Received load: 1,977 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of OSSINGEN?
Aguas SB simulator reference scenario for 1,977 p.e. of reported load: 114,930 kWh per year (51.5 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.