Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP Thal - Altenrhein
Switzerland · official identifier CH_WWTP_323700
120,000h-e design capacity (2022) · 24th of 705
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_323700 · reported size 120,000 h-e design capacity · received load 84,930 h-e · reported treatment: PST · data year 2022. 24th of 705 records with reported size in the inventory of Switzerland; 0.73 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.3 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.4901, 9.5673 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2025-08 · In August 2025, the Canton of St. Gallen documented that ozonation and activated carbon treatment at the Altenrhein plant were in operation. Canton of St. Gallen
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 84,930 p.e. of reported load; equivalent average load 95,880 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (28,621 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Au - Rosenbergsau | 9.3 km | 105,833 | 75,990 | primary, secondary and tertiary |
| Steinach - Morgental | 10.5 km | 66,600 | 48,785 | primary, secondary and tertiary |
| Rehetobel(Habset) | 11.0 km | 200 | 59 | primary, secondary and tertiary |
| St.Gallen - Hofen | 13.1 km | 76,500 | 81,924 | primary, secondary and tertiary |
| Altstätten | 13.6 km | 18,000 | 14,966 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Thal - Altenrhein report?
Reported size: 120,000 h-e design capacity. Received load: 84,930 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Thal - Altenrhein?
Aguas SB simulator reference scenario for 84,930 p.e. of reported load: 3,688,563 kWh per year (38.5 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.