WWTP URNAESCH(FURT)

Switzerland · official identifier CH_WWTP_300600

5,400h-e design capacity (2022) · 354th of 705

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_300600 · reported size 5,400 h-e design capacity · received load 2,317 h-e · reported treatment: PST · data year 2022. 354th of 705 records with reported size in the inventory of Switzerland; 0.03 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.1 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

5,400h-e design capacity
2,317h-e received load (2022)
43 %reported load/capacity ratio (not hydraulic utilisation)
354th of 705by reported size among the 705 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.3265, 9.2943 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

132,894reference kWh per year for this load
50.8kWh per h-e (average load) per year
19,934€ per year at 0.15 €/kWh
65 %share of energy used for aeration

what this estimate is · Inputs: 2,317 p.e. of reported load; equivalent average load 2,616 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (781 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Hundwil(Boemmeli)1.1 km21226primary, secondary and tertiary
Waldstatt(Aueli)3.9 km3,4002,159primary, secondary and tertiary
Neckertal-Tüfi6.3 km2,7504,646primary, secondary and tertiary
Herisau(Bachwis)7.8 km34,00030,192primary, secondary and tertiary
Appenzell(Boedeli)7.9 km20,00015,672primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP URNAESCH(FURT) report?

Reported size: 5,400 h-e design capacity. Received load: 2,317 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of URNAESCH(FURT)?

Aguas SB simulator reference scenario for 2,317 p.e. of reported load: 132,894 kWh per year (50.8 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.