Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP BODMIN (SCARLETTS WELL) STW
United Kingdom · official identifier UKENSW_SWS_TP000005
9,824h-e design capacity (2018) · 939th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSW_SWS_TP000005 · reported size 9,824 h-e design capacity · received load 5,032 h-e · reported treatment: PS · data year 2018. 939th of 1,875 records with reported size in the inventory of United Kingdom; 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.1 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 50.4740, -4.7419 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Bodmin (Nanstallon) Stw | 1.1 km | 19,608 | 17,202 | primary and secondary |
| St Austell North Stw | 9.3 km | 11,208 | 10,512 | primary and secondary |
| Wadebridge Stw | 9.5 km | 12,199 | 7,708 | primary and secondary |
| Lostwithiel Stw | 10.2 km | 3,413 | 3,018 | primary and secondary |
| Porthilly Stw | 14.1 km | 8,016 | 7,975 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BODMIN (SCARLETTS WELL) STW report?
Reported size: 9,824 h-e design capacity. Received load: 5,032 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.