Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP BRAMPTON STW · UKENAN_AW_TP000030
United Kingdom · official identifier UKENAN_AW_TP000030
7,000h-e design capacity (2018) · 1118th of 1,875 (tied with 6 others)
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENAN_AW_TP000030 · reported size 7,000 h-e design capacity · received load 5,519 h-e · reported treatment: PS · data year 2018. 1118th of 1,875 records with reported size in the inventory of United Kingdom (tied with 6 others); < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.4 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 52.3149, -0.2153 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Buckden Stw | 3.4 km | 5,113 | 5,113 | primary and secondary |
| Huntingdon Stw | 4.5 km | 55,140 | 39,369 | primary and secondary |
| Alconbury Stw | 6.0 km | 5,170 | 3,751 | primary and secondary |
| Wyton Stw Stw | 6.8 km | 4,000 | 1,776 | primary and secondary |
| St Neots Stw | 8.5 km | 40,641 | 40,194 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BRAMPTON STW · UKENAN_AW_TP000030 report?
Reported size: 7,000 h-e design capacity. Received load: 5,519 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.