Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP BRIDPORT STW
United Kingdom · official identifier UKENSW_WXW_TP000012
37,017h-e design capacity (2018) · 409th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSW_WXW_TP000012 · reported size 37,017 h-e design capacity · received load 30,699 h-e · reported treatment: PS · data year 2018. 409th of 1,875 records with reported size in the inventory of United Kingdom; 0.04 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 50.7135, -2.7506 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Chideock Stw | 4.8 km | 2,439 | 1,014 | primary and secondary |
| Charmouth Stw | 10.4 km | 6,517 | 3,560 | primary and secondary |
| Crewkerne East Stw | 19.0 km | 7,168 | 7,168 | primary and secondary |
| Tatworth Stw | 19.4 km | 3,188 | 2,403 | primary and secondary |
| Axminster Stw | 20.3 km | 15,748 | 9,034 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BRIDPORT STW report?
Reported size: 37,017 h-e design capacity. Received load: 30,699 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.