WWTP BRISTOL STW

United Kingdom · official identifier UKENSW_WXW_TP000004

1,004,450h-e design capacity (2018) · 7th of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSW_WXW_TP000004 · reported size 1,004,450 h-e design capacity · received load 899,681 h-e · reported treatment: PS · data year 2018. 7th of 1,875 records with reported size in the inventory of United Kingdom; 1.1 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

1,004,450h-e design capacity
899,681h-e received load (2018)
90 %reported load/capacity ratio (not hydraulic utilisation)
7th of 1,875by reported size among the 1,875 records with a size in the inventory · 1.1 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates51.5106, -2.6744 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2014-11-17 · The biomethane unit at Bristol’s Avonmouth treatment plant injected its first gas into the grid. Water Projects Online

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Portsihead / Pill Stw4.8 km31,18529,052primary and secondary
Redwick Stw7.0 km12,6244,542primary and secondary
Almondsbury Stw8.8 km2,6982,698primary and secondary
Alveston Stw12.1 km2,3082,308primary and secondary
Thornbury Stw16.0 km14,27614,276primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BRISTOL STW report?

Reported size: 1,004,450 h-e design capacity. Received load: 899,681 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.