Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP BURY STW
United Kingdom · official identifier UKENNW_UU_TP000026
276,925h-e design capacity (2018) · 54th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENNW_UU_TP000026 · reported size 276,925 h-e design capacity · received load 189,764 h-e · reported treatment: PS · data year 2018. 54th of 1,875 records with reported size in the inventory of United Kingdom; 0.29 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.7 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 53.5665, -2.3029 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2021-12-10 · The public discharge register records a historical permit for Bury wastewater treatment works at Crossfield Street starting on 10 December 2021. Environment Agency
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Bolton Stw | 4.7 km | 396,367 | 396,367 | primary and secondary |
| Castleton Stw | 8.2 km | 5,886 | 5,700 | primary and secondary |
| Worsley Stw | 9.3 km | 22,983 | 22,983 | primary and secondary |
| Rochdale Stw | 9.5 km | 216,283 | 187,840 | primary and secondary |
| Salford Stw | 9.7 km | 114,971 | 114,971 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BURY STW report?
Reported size: 276,925 h-e design capacity. Received load: 189,764 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.