Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP CARMARTHEN STW
United Kingdom · official identifier UKWAWA_WW_TP000059
23,455h-e design capacity (2018) · 557th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKWAWA_WW_TP000059 · reported size 23,455 h-e design capacity · received load 22,228 h-e · reported treatment: PST · data year 2018. 557th of 1,875 records with reported size in the inventory of United Kingdom; 0.02 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.5 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.8367, -4.3274 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| St Clears Wwtw Stw | 11.5 km | 2,989 | 2,946 | primary and secondary |
| Kidwelly Wastewater Treatment Works Stw | 11.6 km | 4,574 | 3,565 | primary and secondary |
| Pontyates Wwtw Pontyates Llanelli Stw | 11.8 km | 2,955 | 2,728 | primary and secondary |
| Pontyberem Wwtw Pontyberem Carms Stw | 11.9 km | 10,436 | 10,096 | primary, secondary and tertiary |
| Trimsaran Wwtw Spudder Bridge Rd Stw | 12.6 km | 2,942 | 2,600 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CARMARTHEN STW report?
Reported size: 23,455 h-e design capacity. Received load: 22,228 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.