Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP CHIEVELEY, CHIEVELEY, BERKS STW"

United Kingdom · official identifier UKENTH_TWU_TP000040

5,450h-e design capacity (2018) · 1262nd of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENTH_TWU_TP000040 · reported size 5,450 h-e design capacity · received load 5,257 h-e · reported treatment: PS · data year 2018. 1262nd of 1,875 records with reported size in the inventory of United Kingdom; < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.6 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

5,450h-e design capacity
5,257h-e received load (2018)
96 %reported load/capacity ratio (not hydraulic utilisation)
1262nd of 1,875by reported size among the 1,875 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates51.4622, -1.3263 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Newbury Stw7.8 km86,39886,398primary and secondary
East Shefford, East Shefford, B Stw"7.8 km6,0905,432primary and secondary
Kintbury Stw10.0 km3,7053,705primary and secondary
Washwater Stw11.5 km7,3877,150primary and secondary
Hungerford, Hungerford, Berks Stw"12.8 km7,5506,548primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CHIEVELEY, CHIEVELEY, BERKS STW" report?

Reported size: 5,450 h-e design capacity. Received load: 5,257 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.