Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP DALDERSE WWTW
United Kingdom · official identifier UKSC_TP00048
120,000h-e design capacity (2018) · 145th of 1,875 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKSC_TP00048 · reported size 120,000 h-e design capacity · received load 91,701 h-e · reported treatment: PS · data year 2018. 145th of 1,875 records with reported size in the inventory of United Kingdom (tied with 1 others); 0.13 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 10 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 56.0200, -3.7606 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Kincardine Wwtw | 5.6 km | 4,200 | 3,144 | primary and secondary |
| Kinneil Kerse Wwtw | 5.7 km | 55,900 | 49,458 | primary and secondary |
| Airth Wwtw | 5.9 km | 2,475 | 1,731 | primary and secondary |
| Bonnybridge Wwtw | 6.8 km | 17,000 | 15,709 | primary, secondary and tertiary |
| Plean, Wwtw | 7.8 km | 3,050 | 2,054 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP DALDERSE WWTW report?
Reported size: 120,000 h-e design capacity. Received load: 91,701 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.