Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP EDINBURGH, SEAFIELD WWTW
United Kingdom · official identifier UKSC_TP00070
752,367h-e design capacity (2018) · 13th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKSC_TP00070 · reported size 752,367 h-e design capacity · received load 764,659 h-e · reported treatment: PS · data year 2018. 13th of 1,875 records with reported size in the inventory of United Kingdom; 0.79 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 15.0 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 55.9706, -3.1423 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 1978-04 · Wastewater treatment began in Edinburgh with the completion of Seafield. Tampere University, WaterTime case study
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Ormiston Wwtw | 15.0 km | 5,100 | 3,075 | primary, secondary and tertiary |
| Penicuik Wwtw | 15.5 km | 15,367 | 13,191 | primary, secondary and tertiary |
| Gorebridge Wwtw | 15.5 km | 5,126 | 4,034 | primary and secondary |
| Newbridge Wwtw | 16.3 km | 76,133 | 39,818 | primary, secondary and tertiary |
| Kirkcaldy Wwtw | 16.4 km | 73,000 | 61,055 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP EDINBURGH, SEAFIELD WWTW report?
Reported size: 752,367 h-e design capacity. Received load: 764,659 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.