Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP FAREHAM AND GOSPORT, HAMBLE, HEDGE END (PEEL COMMON) STW"
United Kingdom · official identifier UKENSO_SW_TP000008
269,373h-e design capacity (2018) · 56th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSO_SW_TP000008 · reported size 269,373 h-e design capacity · received load 269,373 h-e · reported treatment: PS · data year 2018. 56th of 1,875 records with reported size in the inventory of United Kingdom; 0.28 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 50.8259, -1.1943 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2024-05-24 · The official list included Peel Common among plants with a nitrogen removal upgrade date, set for 1 April 2030. Department for Environment, Food and Rural Affairs
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Wickham Stw | 7.6 km | 2,442 | 2,442 | primary and secondary |
| Fawley, Calshot, Blackfield Stw" | 10.3 km | 14,895 | 14,413 | primary and secondary |
| Bishops Waltham New Stw | 13.2 km | 15,917 | 13,534 | primary and secondary |
| Portsmouth And Havant Stw | 14.2 km | 374,241 | 374,241 | primary and secondary |
| Southampton South East (Woolston) Stw | 15.1 km | 67,005 | 67,005 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP FAREHAM AND GOSPORT, HAMBLE, HEDGE END (PEEL COMMON) STW" report?
Reported size: 269,373 h-e design capacity. Received load: 269,373 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.