Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP FAVERSHAM STW
United Kingdom · official identifier UKENSO_SW_TP000055
53,632h-e design capacity (2018) · 297th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSO_SW_TP000055 · reported size 53,632 h-e design capacity · received load 53,632 h-e · reported treatment: PS · data year 2018. 297th of 1,875 records with reported size in the inventory of United Kingdom; 0.06 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.3 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.3225, 0.9101 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Teynham Stw | 7.3 km | 3,842 | 3,842 | primary and secondary |
| Eastchurch Stw | 8.8 km | 8,467 | 7,993 | primary and secondary |
| Chartham Stw | 11.2 km | 6,701 | 6,701 | primary and secondary |
| Swalecliffe Stw | 11.7 km | 36,960 | 35,973 | primary and secondary |
| Sittingbourne Stw | 12.1 km | 85,976 | 85,976 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP FAVERSHAM STW report?
Reported size: 53,632 h-e design capacity. Received load: 53,632 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.