Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP Gilford

United Kingdom · official identifier UKNI_TP00043

3,262h-e design capacity (2018) · 1564th of 1,875 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKNI_TP00043 · reported size 3,262 h-e design capacity · received load 2,447 h-e · reported treatment: PS · data year 2018. 1564th of 1,875 records with reported size in the inventory of United Kingdom (tied with 1 others); < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.5 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

3,262h-e design capacity
2,447h-e received load (2018)
75 %reported load/capacity ratio (not hydraulic utilisation)
1564th of 1,875by reported size among the 1,875 records with a size in the inventory (tied with 1 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates54.3740, -6.3710 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Tandragee3.5 km19,30011,686primary, secondary and tertiary
Banbridge6.2 km40,00021,733primary, secondary and tertiary
Waringstown8.4 km7,5007,230primary and secondary
Richhill11.1 km4,9142,691primary and secondary
Ballynacor11.2 km130,887119,583primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Gilford report?

Reported size: 3,262 h-e design capacity. Received load: 2,447 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.