Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP GREAT YARMOUTH (CAISTER) STW
United Kingdom · official identifier UKENAN_AW_TP000115
170,000h-e design capacity (2018) · 91st of 1,875 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENAN_AW_TP000115 · reported size 170,000 h-e design capacity · received load 110,960 h-e · reported treatment: PS · data year 2018. 91st of 1,875 records with reported size in the inventory of United Kingdom (tied with 1 others); 0.18 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.2 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 52.6394, 1.7211 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2002-01-01 · The environmental register records the start of permit AN/AEECS12404/001 for the wastewater plant's headworks pumping station. Environment Agency
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Acle Stw | 11.2 km | 4,000 | 3,741 | primary and secondary |
| Lowestoft Stw | 13.4 km | 405,000 | 97,249 | primary and secondary |
| Ludham Stw | 15.3 km | 7,775 | 3,482 | primary and secondary |
| Sisland Stw | 21.1 km | 8,101 | 7,699 | primary and secondary |
| Stalham Stw | 21.3 km | 9,976 | 9,230 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP GREAT YARMOUTH (CAISTER) STW report?
Reported size: 170,000 h-e design capacity. Received load: 110,960 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.