Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP HATHERSAGE STW
United Kingdom · official identifier UKENMI_ST_TP000291
1,803h-e design capacity (2018) · 1873rd of 1,875
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENMI_ST_TP000291 · reported size 1,803 h-e design capacity · reported treatment: PS · data year 2018. 1873rd of 1,875 records with reported size in the inventory of United Kingdom; < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 53.3220, -1.6467 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Bradwell Stw | 5.8 km | 4,505 | 4,504 | primary and secondary |
| Baslow Stw | 9.0 km | 6,000 | 5,000 | primary and secondary |
| Tideswell Stw | 10.2 km | 2,600 | 2,203 | primary and secondary |
| Dronfield Stw | 13.4 km | 25,716 | 23,338 | primary and secondary |
| Bakewell Stw | 15.1 km | 11,000 | 10,500 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP HATHERSAGE STW report?
Reported size: 1,803 h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.