WWTP HUDDERSFIELD STW
United Kingdom · official identifier UKENNE_YW_TP000094
514,181h-e design capacity (2018) · 23rd of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENNE_YW_TP000094 · reported size 514,181 h-e design capacity · received load 276,920 h-e · reported treatment: PS · data year 2018. 23rd of 1,875 records with reported size in the inventory of United Kingdom; 0.54 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.0 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 53.6825, -1.7274 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2015-03-18 · The environmental register records this date as the start of a discharge permit for the treatment plant at Huddersfield, Mirfield. Environment Agency
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Dewsbury And Batley Stw | 8.0 km | 379,734 | 370,174 | primary and secondary |
| Halifax Stw | 9.0 km | 195,098 | 174,884 | primary and secondary |
| Holmfirth Stw | 9.8 km | 32,824 | 29,681 | primary and secondary |
| Meltham Stw | 11.3 km | 8,642 | 8,642 | primary and secondary |
| Horbury Stw | 12.3 km | 16,631 | 16,631 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP HUDDERSFIELD STW report?
Reported size: 514,181 h-e design capacity. Received load: 276,920 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.