Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP LINCLUDEN S.T.W.
United Kingdom · official identifier UKSC_TP00122
12,500h-e design capacity (2018) · 828th of 1,875 (tied with 2 others)
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKSC_TP00122 · reported size 12,500 h-e design capacity · received load 8,180 h-e · reported treatment: PS · data year 2018. 828th of 1,875 records with reported size in the inventory of United Kingdom (tied with 2 others); 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 55.0860, -3.6260 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Dalscone S.T.W. (New) | 1.9 km | 6,173 | 3,796 | primary and secondary |
| Dalscone S.T.W. (Old) | 1.9 km | 3,893 | 2,394 | primary and secondary |
| Troqueer S.T.W. | 3.6 km | 46,228 | 43,350 | primary and secondary |
| Lochmaben S.T.W. | 14.6 km | 6,500 | 2,095 | primary and secondary |
| Lockerbie S.T.W. | 16.6 km | 5,200 | 4,707 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LINCLUDEN S.T.W. report?
Reported size: 12,500 h-e design capacity. Received load: 8,180 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.