Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP LLANBEDR STW

United Kingdom · official identifier UKWAWA_WW_TP000131

2,683h-e design capacity (2018) · 1702nd of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKWAWA_WW_TP000131 · reported size 2,683 h-e design capacity · received load 2,458 h-e · reported treatment: PST · data year 2018. 1702nd of 1,875 records with reported size in the inventory of United Kingdom; < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

2,683h-e design capacity
2,458h-e received load (2018)
92 %reported load/capacity ratio (not hydraulic utilisation)
1702nd of 1,875by reported size among the 1,875 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates52.8262, -4.1068 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Dyffryn Ardudwy Stw3.9 km8,8578,857primary and secondary
Porthmadog Stw11.6 km5,7695,669primary and secondary
Penrhyndeudraeth Stw11.6 km2,2282,228primary and secondary
Dolgellau St Stw16.0 km5,4175,417primary and secondary
B/Au Fes Stw Stw20.4 km5,1953,675primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP LLANBEDR STW report?

Reported size: 2,683 h-e design capacity. Received load: 2,458 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.