Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP LONDON (Beddington STW)
United Kingdom · official identifier UKENTH_TWU_TP000015
405,886h-e design capacity (2018) · 38th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENTH_TWU_TP000015 · reported size 405,886 h-e design capacity · received load 405,886 h-e · reported treatment: PS · data year 2018. 38th of 1,875 records with reported size in the inventory of United Kingdom; 0.42 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.7 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.3812, -0.1403 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 1985-01-31 · The environmental register records the start of discharge permit TH/CSSV.0382/001 for the wastewater treatment plant. Environment Agency
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| London (Hogsmill Valley Stw) | 10.7 km | 421,000 | 407,056 | primary and secondary |
| Merstham Stw | 14.1 km | 9,555 | 9,555 | primary and secondary |
| Esher, Farm Road, Esher, Surrey Stw" | 16.0 km | 128,252 | 113,887 | primary and secondary |
| London (Mogden Stw) | 16.4 km | 2,013,584 | 1,980,153 | primary and secondary |
| Leatherhead Stw | 16.9 km | 46,809 | 46,809 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LONDON (Beddington STW) report?
Reported size: 405,886 h-e design capacity. Received load: 405,886 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.