Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP NEWNHAM VALLEY STW
United Kingdom · official identifier UKENSO_SW_TP000056
7,296h-e design capacity (2018) · 1109th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSO_SW_TP000056 · reported size 7,296 h-e design capacity · received load 7,089 h-e · reported treatment: PS · data year 2018. 1109th of 1,875 records with reported size in the inventory of United Kingdom; < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.3 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.3061, 1.2051 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Westbere Stw | 3.3 km | 6,467 | 6,383 | primary and secondary |
| Wingham, Aylesham Stw" | 4.2 km | 28,180 | 19,991 | primary and secondary |
| Herne Bay Stw | 6.7 km | 41,673 | 41,673 | primary and secondary |
| Canterbury Stw | 6.7 km | 65,179 | 65,179 | primary and secondary |
| Minster Stw | 7.6 km | 5,056 | 5,056 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP NEWNHAM VALLEY STW report?
Reported size: 7,296 h-e design capacity. Received load: 7,089 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.