Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP NEWPORT STW · UKWAWA_WW_TP000006
United Kingdom · official identifier UKWAWA_WW_TP000006
304,036h-e design capacity (2018) · 49th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKWAWA_WW_TP000006 · reported size 304,036 h-e design capacity · received load 296,808 h-e · reported treatment: PS · data year 2018. 49th of 1,875 records with reported size in the inventory of United Kingdom; 0.32 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.8 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.5489, -2.9619 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2024 · The Welsh public register lists permit AB0067101 from 2024 for Nash wastewater treatment works in Newport. Natural Resources Wales
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Ponthir Stw | 8.8 km | 113,199 | 98,300 | primary and secondary |
| Cardiff Stw | 14.3 km | 977,283 | 938,277 | primary and secondary |
| Clevedon / Nailsea / Yatton Stw | 16.5 km | 64,593 | 55,069 | primary and secondary |
| Usk Stw Graig Olway Farm Llangview Stw | 16.7 km | 3,144 | 3,100 | primary and secondary |
| Portsihead / Pill Stw | 16.9 km | 31,185 | 29,052 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP NEWPORT STW · UKWAWA_WW_TP000006 report?
Reported size: 304,036 h-e design capacity. Received load: 296,808 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.