Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP Newtownards (Ballyrickard)
United Kingdom · official identifier UKNI_TP00065
499,080h-e design capacity (2018) · 25th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKNI_TP00065 · reported size 499,080 h-e design capacity · received load 47,960 h-e · reported treatment: PST · data year 2018. 25th of 1,875 records with reported size in the inventory of United Kingdom; 0.52 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.6 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 54.5600, -5.6990 precision reported by the source: level 0 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2008 · In 2008, the authority documented works at Ballyrickard to add nitrogen removal and ultraviolet treatment. Northern Ireland Environment and Heritage Service
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Ballygowan | 8.6 km | 3,000 | 3,372 | primary and secondary |
| Moneyreagh | 8.6 km | 2,150 | 2,386 | primary, secondary and tertiary |
| Killinchy | 9.7 km | 4,640 | 2,271 | primary and secondary |
| Kinnegar | 12.9 km | 110,000 | 82,895 | primary, secondary and tertiary |
| North Down & Ards | 13.1 km | 104,000 | 69,050 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Newtownards (Ballyrickard) report?
Reported size: 499,080 h-e design capacity. Received load: 47,960 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.