Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP NORTH ELY VALLEY STW
United Kingdom · official identifier UKWAWA_WW_TP000012
13,943h-e design capacity (2018) · 792nd of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKWAWA_WW_TP000012 · reported size 13,943 h-e design capacity · received load 13,943 h-e · reported treatment: PST · data year 2018. 792nd of 1,875 records with reported size in the inventory of United Kingdom; 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.9 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 51.5547, -3.4040 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Rhiwsaeson Stw Rhiwsaeson Llantri Stw | 4.9 km | 22,707 | 22,707 | primary and secondary |
| South Ely Valley Stw | 7.1 km | 52,742 | 51,665 | primary, secondary and tertiary |
| Creigiau Sew Stw | 7.5 km | 2,482 | 2,407 | primary and secondary |
| Cynon Valley Stw | 9.7 km | 68,792 | 67,165 | primary, secondary and tertiary |
| Rhydlafar St Stw | 9.7 km | 3,003 | 2,852 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP NORTH ELY VALLEY STW report?
Reported size: 13,943 h-e design capacity. Received load: 13,943 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.