Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP NORTH FERRIBY STW

United Kingdom · official identifier UKENNE_YW_TP000110

6,961h-e design capacity (2018) · 1125th of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENNE_YW_TP000110 · reported size 6,961 h-e design capacity · received load 6,696 h-e · reported treatment: PS · data year 2018. 1125th of 1,875 records with reported size in the inventory of United Kingdom; < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.7 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

6,961h-e design capacity
6,696h-e received load (2018)
96 %reported load/capacity ratio (not hydraulic utilisation)
1125th of 1,875by reported size among the 1,875 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates53.7164, -0.4991 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Melton Stw · Ukenne_yw_tp0001041.7 km13,03713,037primary and secondary
Barton-Upon-Humber Stw4.8 km12,12511,979primary and secondary
Winteringham Stw6.0 km11,2069,051primary and secondary
New Holland8.6 km5,7345,384primary and secondary
Skidby Stw8.9 km2,2582,180primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP NORTH FERRIBY STW report?

Reported size: 6,961 h-e design capacity. Received load: 6,696 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.