Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP PEEBLES WWTW

United Kingdom · official identifier UKSC_TP00154

8,500h-e design capacity (2018) · 1006th of 1,875 (tied with 4 others)

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKSC_TP00154 · reported size 8,500 h-e design capacity · received load 9,775 h-e · reported treatment: PST · data year 2018. 1006th of 1,875 records with reported size in the inventory of United Kingdom (tied with 4 others); < 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

8,500h-e design capacity
9,775h-e received load (2018)
115 %reported load/capacity ratio (not hydraulic utilisation)
1006th of 1,875by reported size among the 1,875 records with a size in the inventory (tied with 4 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates55.6470, -3.1613 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Walkerburn Wwtw10.2 km4,2004,399primary and secondary
Penicuik Wwtw21.2 km15,36713,191primary, secondary and tertiary
Biggar S.T.W.22.2 km3,7003,510primary and secondary
Gorebridge Wwtw22.5 km5,1264,034primary and secondary
Selkirk Wwtw22.7 km25,0006,531primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP PEEBLES WWTW report?

Reported size: 8,500 h-e design capacity. Received load: 9,775 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.