Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP TORPOINT STW
United Kingdom · official identifier UKENSW_SWS_TP000076
16,052h-e design capacity (2018) · 706th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENSW_SWS_TP000076 · reported size 16,052 h-e design capacity · received load 8,304 h-e · reported treatment: PS · data year 2018. 706th of 1,875 records with reported size in the inventory of United Kingdom; 0.02 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.3 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 50.3662, -4.2297 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Millbrook Stw | 2.3 km | 3,765 | 3,644 | primary and secondary |
| Plymouth (Camels Head) Stw | 4.8 km | 53,419 | 53,419 | primary and secondary |
| Ernesettle And Saltash Stw | 6.7 km | 75,561 | 63,952 | primary and secondary |
| Plymouth Central Stw | 8.2 km | 125,508 | 119,442 | primary and secondary |
| Plymouth (Radford) Stw | 8.8 km | 28,355 | 27,089 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP TORPOINT STW report?
Reported size: 16,052 h-e design capacity. Received load: 8,304 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.