Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP ULVERSTON STW
United Kingdom · official identifier UKENNW_UU_TP000121
17,253h-e design capacity (2018) · 679th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENNW_UU_TP000121 · reported size 17,253 h-e design capacity · received load 17,253 h-e · reported treatment: PS · data year 2018. 679th of 1,875 records with reported size in the inventory of United Kingdom; 0.02 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 54.1862, -3.0633 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Grange-Over-Sands Stw | 8.8 km | 9,998 | 9,229 | primary and secondary |
| Newbiggin Stw Humus Tank Effluent | 9.3 km | 2,498 | 2,379 | primary and secondary |
| Askam-In-Furness Stw | 9.6 km | 3,578 | 3,308 | primary and secondary |
| Millom Stw | 11.7 km | 8,631 | 8,366 | primary and secondary |
| Barrow-In-Furness Stw | 12.3 km | 80,774 | 70,563 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ULVERSTON STW report?
Reported size: 17,253 h-e design capacity. Received load: 17,253 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.