Worldwide wastewater treatment observatory · United States · Arizona

Aguas SB Observatory · public data to understand water

WWTP Chandler Airport WRF

Chandler · official identifier CWNS2022_04001304002

27MGD reported design flow (2022) · 298th of 15,772 (tied with 7 others)

EPA Clean Watersheds Needs Survey 2022 · official identifier CWNS2022_04001304002 · reported size 27 MGD reported design flow · reported treatment: Advanced · data year 2022. 298th of 15,772 records with reported size in the inventory of United States (tied with 7 others); 0.05 % of the sum of those 15,772 records in MGD (sum of records, not national capacity); nearest inventoried plant at 5.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

27MGD reported design flow
298th of 15,772by reported size among the 15,772 records with a size in the inventory (tied with 7 others) · 0.05 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
TreatmentAdvanced · reported levels
Reported coordinates33.2584, -111.8270 precision reported by the source: 4 m what it means
Source and yearEPA Clean Watersheds Needs Survey 2022 · dataset record

REGULATORY REFERENCES

Referencia normativa: United States

Regulatory framework of United States. Individual applicability is not determined in this profile.

LOCATION

Arizona: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceMGD reported design flowTreatment
Chandler Ocotillo WRF5.8 km18Advanced
Mesa Greenfield WRP8.0 km30Advanced
Gilbert Neely WWTF11.4 km11Advanced
CHANDLER LONE BUTTE WWTF17.6 km10Secondary
MESA SOUTHEAST WRP18.3 km8Advanced

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Chandler Airport WRF report?

Reported size: 27 MGD reported design flow. Units are retained without conversion.

What treatment is reported?

Treatment Advanced. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · EPA Clean Watersheds Needs Survey 2022 · data 2022 · edition 2022 · source licence: Public domain (EPA geospatial default; see LICENCIA.txt) · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.