Worldwide wastewater treatment observatory · United States · Oregon

Aguas SB Observatory · public data to understand water

WWTP ROCK CREEK STP

Hillsboro · official identifier CWNS2022_41000022013

39.05MGD reported design flow (2022) · 212th of 15,772

EPA Clean Watersheds Needs Survey 2022 · official identifier CWNS2022_41000022013 · reported size 39.05 MGD reported design flow · reported treatment: Advanced · data year 2022. 212th of 15,772 records with reported size in the inventory of United States; 0.08 % of the sum of those 15,772 records in MGD (sum of records, not national capacity); nearest inventoried plant at 3.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

39.05MGD reported design flow
212th of 15,772by reported size among the 15,772 records with a size in the inventory · 0.08 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
TreatmentAdvanced · reported levels
Reported coordinates45.4978, -122.9502 precision reported by the source: 4 m what it means
Source and yearEPA Clean Watersheds Needs Survey 2022 · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Instalación CWNS 41000022013): 249,542 inhabitants (2022, U.S. Environmental Protection Agency (EPA)).

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: United States

Regulatory framework of United States. Individual applicability is not determined in this profile.

LOCATION

Oregon: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceMGD reported design flowTreatment
HILLSBORO WESTSIDE STP3.6 km7.5Secondary
FOREST GROVE STP11.1 km5.5Secondary
DURHAM STP17.9 km22.6Advanced
COVE ORCHARD SEWER SERVICE DIST20.9 km0.02Secondary
COLUMBIA BLVD. STP21.1 km100Secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROCK CREEK STP report?

Reported size: 39.05 MGD reported design flow. Units are retained without conversion.

What treatment is reported?

Treatment Advanced. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · EPA Clean Watersheds Needs Survey 2022 · data 2022 · edition 2022 · source licence: Public domain (EPA geospatial default; see LICENCIA.txt) · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.