Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana
Aguas SB Observatory · public data to understand water
WWTP ORIHUELA - COSTA
Orihuela · official identifier ES10030990008010E
90,000h-e design capacity (2022) · 218th of 2,166 (tied with 7 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10030990008010E · reported size 90,000 h-e design capacity · received load 101,602 h-e · reported treatment: PST · data year 2022. 218th of 2,166 records with reported size in the inventory of Spain (tied with 7 others); 0.09 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.1 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 37.9166, -0.7570 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Pilar de la Horadada | 3.1 km | 138,750 | 55,391 | primary, secondary and tertiary |
| Torrevieja | 7.6 km | 490,000 | 300,900 | primary, secondary and tertiary |
| San Miguel de Salinas | 7.8 km | 8,000 | 5,756 | primary, secondary and tertiary |
| San Pedro del Pinatar | 8.7 km | 145,000 | 65,591 | primary, secondary and tertiary |
| Orihuela - Torremendo | 12.9 km | 2,500 | 661 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ORIHUELA - COSTA report?
Reported size: 90,000 h-e design capacity. Received load: 101,602 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.