Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana
Aguas SB Observatory · public data to understand water
WWTP TORREVIEJA
Torrevieja · official identifier ES10031330002060E
490,000h-e design capacity (2022) · 38th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10031330002060E · reported size 490,000 h-e design capacity · received load 300,900 h-e · reported treatment: PST · data year 2022. 38th of 2,166 records with reported size in the inventory of Spain; 0.48 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.3 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 37.9711, -0.7042 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| San Miguel de Salinas | 7.3 km | 8,000 | 5,756 | primary, secondary and tertiary |
| Orihuela - Costa | 7.6 km | 90,000 | 101,602 | primary, secondary and tertiary |
| Rojales - Lo Pepin | 9.6 km | 9,750 | 14,237 | primary, secondary and tertiary |
| Pilar de la Horadada | 10.6 km | 138,750 | 55,391 | primary, secondary and tertiary |
| Rojales - Ciudad Quesada 1 | 11.4 km | 3,645 | 541 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP TORREVIEJA report?
Reported size: 490,000 h-e design capacity. Received load: 300,900 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.