Worldwide wastewater treatment observatory · Spain · Extremadura

Aguas SB Observatory · public data to understand water

WWTP TORRE DE DON MIGUEL-CADALSO-DESCARGAMARIA-ROBLEDILLO DE GATA

Torre de Don Miguel · official identifier ES11101870001010E

6,000h-e design capacity (2022) · 1328th of 2,166 (tied with 33 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES11101870001010E · reported size 6,000 h-e design capacity · received load 5,700 h-e · reported treatment: PS · data year 2022. 1328th of 2,166 records with reported size in the inventory of Spain (tied with 33 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.9 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

6,000h-e design capacity
5,700h-e received load (2022)
95 %reported load/capacity ratio (not hydraulic utilisation)
1328th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 33 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates40.2275, -6.5337 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Extremadura: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Gata5.9 km4,0003,100primary and secondary
Villanueva de la Sierra-Torrecilla de los Angeles-Hernan Per8.6 km8,5004,900primary and secondary
Perales del Puerto14.0 km3,9002,400primary and secondary
Acebo-Hoyos16.2 km4,5004,500primary and secondary
Guijo de Galisteo18.6 km3,0003,000primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TORRE DE DON MIGUEL-CADALSO-DESCARGAMARIA-ROBLEDILLO DE GATA report?

Reported size: 6,000 h-e design capacity. Received load: 5,700 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.