Worldwide wastewater treatment observatory · Spain · Extremadura
Aguas SB Observatory · public data to understand water
WWTP VILLANUEVA DE LA SIERRA-TORRECILLA DE LOS ANGELES-HERNAN PER
Villanueva de la Sierra · official identifier ES11102110001010E
8,500h-e design capacity (2022) · 1098th of 2,166 (tied with 5 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES11102110001010E · reported size 8,500 h-e design capacity · received load 4,900 h-e · reported treatment: PS · data year 2022. 1098th of 2,166 records with reported size in the inventory of Spain (tied with 5 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.2060, -6.4366 reported precision: approximate (~111 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Torre de Don Miguel-Cadalso-Descargamaria-Robledillo de Gata | 8.6 km | 6,000 | 5,700 | primary and secondary |
| Guijo de Galisteo | 13.7 km | 3,000 | 3,000 | primary and secondary |
| Pinofranqueado | 13.8 km | 5,000 | 3,100 | primary and secondary |
| Gata | 14.4 km | 4,000 | 3,100 | primary and secondary |
| Montehermoso | 16.3 km | 8,000 | 8,000 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP VILLANUEVA DE LA SIERRA-TORRECILLA DE LOS ANGELES-HERNAN PER report?
Reported size: 8,500 h-e design capacity. Received load: 4,900 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.