Worldwide wastewater treatment observatory · Spain · Comunidad de Madrid
Aguas SB Observatory · public data to understand water
WWTP COLMENAREJO ESTE
Colmenarejo · official identifier ES13280440001011E
5,000h-e design capacity (2022) · 1442nd of 2,166 (tied with 49 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES13280440001011E · reported size 5,000 h-e design capacity · received load 796 h-e · reported treatment: PS · data year 2022. 1442nd of 2,166 records with reported size in the inventory of Spain (tied with 49 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.2 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.5443, -4.0000 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Colmenarejo Oeste | 2.2 km | 14,000 | 5,166 | primary and secondary |
| Galapagar-Torrelodones | 4.9 km | 90,000 | 23,856 | primary, secondary and tertiary |
| Jarabeltrán (Cerro del Aguila) | 6.2 km | 2,250 | 2,250 | primary and secondary |
| El Endrinal | 8.4 km | 116,683 | 82,266 | primary, secondary and tertiary |
| Valdemorillo | 8.8 km | 13,000 | 6,258 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COLMENAREJO ESTE report?
Reported size: 5,000 h-e design capacity. Received load: 796 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.