Worldwide wastewater treatment observatory · Spain · Comunidad de Madrid
Aguas SB Observatory · public data to understand water
WWTP JARABELTRÁN (CERRO DEL AGUILA)
Valdemorillo · official identifier ES13281600012022E
2,250h-e design capacity (2022) · 2040th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES13281600012022E · reported size 2,250 h-e design capacity · received load 2,250 h-e · reported treatment: PS · data year 2022. 2040th of 2,166 records with reported size in the inventory of Spain; < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.9 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.4920, -4.0263 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Valdemorillo | 3.9 km | 13,000 | 6,258 | primary and secondary |
| Villanueva de la Cañada | 5.0 km | 26,666 | 10,030 | primary, secondary and tertiary |
| Colmenarejo Oeste | 5.6 km | 14,000 | 5,166 | primary and secondary |
| Ampliación Cerro Alarcon | 5.7 km | 3,470 | 672 | primary and secondary |
| Colmenarejo Este | 6.2 km | 5,000 | 796 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP JARABELTRÁN (CERRO DEL AGUILA) report?
Reported size: 2,250 h-e design capacity. Received load: 2,250 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.