Worldwide wastewater treatment observatory · Austria

Aguas SB Observatory · public data to understand water

WWTP Neumarkt (Tauchental)

Austria · official identifier ATTP_1-00000097

15,000h-e design capacity (2022) · 223rd of 634 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ATTP_1-00000097 · reported size 15,000 h-e design capacity · received load 7,257 h-e · reported treatment: PST · data year 2022. 223rd of 634 records with reported size in the inventory of Austria (tied with 5 others); 0.06 % of the sum of those 634 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.7 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

15,000h-e design capacity
7,257h-e received load (2022)
48 %reported load/capacity ratio (not hydraulic utilisation)
223rd of 634by reported size among the 634 records with a size in the inventory (tied with 5 others) · 0.06 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.2841, 16.2981 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Austria

Regulatory framework of Austria · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

318,245reference kWh per year for this load
44.2kWh per h-e (average load) per year
47,737€ per year at 0.15 €/kWh
47 %share of energy used for aeration

what this estimate is · Inputs: 7,257 p.e. of reported load; equivalent average load 7,207 p.e. with the reference profile of Austria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,451 m³/day of reference), not measured or available for reclamation.

LOCATION

Austria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Siget / Wart (Mittleres Pinka- Und Zickenbachtal)3.7 km45,00042,793primary, secondary and tertiary
Kleinzicken (Tauchental)8.7 km4,0002,615primary, secondary and tertiary
Schandorf - Schachendorf10.5 km2,0001,116primary, secondary and tertiary
Mischendorf11.5 km5,0002,336primary, secondary and tertiary
Rechnitz11.9 km6,0004,123primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Neumarkt (Tauchental) report?

Reported size: 15,000 h-e design capacity. Received load: 7,257 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Neumarkt (Tauchental)?

Aguas SB simulator reference scenario for 7,257 p.e. of reported load: 318,245 kWh per year (44.2 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.