World wastewater treatment plant observatory · data as reported by each inventory

Wastewater treatment plants in Bulgaria

← Back to the map

321 inventory records · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública)

Data years: 2022. The inventory date does not establish current operation.

321 results

CompareNameNative sizeYear
Kanalizacia BorinoBGCO05462_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BolyartsiBGCO05339_00_01Not reported population equivalent (p.e.)2022
Kanalizacia Bobov dolBGCO04501_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BerkovitsaBGCO03928_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BenkovskiBGCO03825_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BelozemBGCO03620_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BelovoBGCO03592_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BelogradchikBGCO03616_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BelitsaBGCO03504_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BeleneBGCO03366_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BatanovtsiBGCO72223_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BatakBGCO02837_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BanyaBGCO02693_00_01Not reported population equivalent (p.e.)2022
Kanalizacia BanyaBGCO02720_00_01Not reported population equivalent (p.e.)2022
Kanalizacia AytosBGCO00151_00_01Not reported population equivalent (p.e.)2022
Kanalizacia AydemirBGCO00895_00_01Not reported population equivalent (p.e.)2022
Kanalizacia ArdinoBGCO00607_00_01Not reported population equivalent (p.e.)2022
Kanalizacia ApriltsiBGCO52218_00_01Not reported population equivalent (p.e.)2022
Kanalizacia AhtopolBGCO00878_00_01Not reported population equivalent (p.e.)2022
Kanalizacia AheloyBGCO00833_00_01Not reported population equivalent (p.e.)2022
Kanalizacia AblanicaBGCO00014_00_01Not reported population equivalent (p.e.)2022

Regulatory context

EU framework; national review pending. This is not an exhaustive review of applicable law.

European Union: urban wastewater treatment

Directive (EU) 2024/3019 sets phased requirements. Inventory design capacity is not the legally defined load and cannot by itself determine a facility's deadline.

  • Relevant load and agglomeration size, not just design capacity.
  • Receiving area, risk assessment, national transposition and individual permit.
  • Articles 7 and 8: tertiary and quaternary treatment; 150,000 p.e. is a load threshold, not a rule automatically applied to map design capacity.

References reviewed: 2026-11-06. Individual applicability: undetermined. This profile does not establish authorization or compliance.