Worldwide wastewater treatment observatory · Bulgaria

Aguas SB Observatory · public data to understand water

WWTP UWWTP Nesebar-Ravda-Slanchev bryag

Bulgaria · official identifier BGWT51500_00_01

222,000h-e design capacity (2022) · 7th of 124

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BGWT51500_00_01 · reported size 222,000 h-e design capacity · received load 138,384 h-e · reported treatment: PST · data year 2022. 7th of 124 records with reported size in the inventory of Bulgaria; 2.6 % of the sum of those 124 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

222,000h-e design capacity
138,384h-e received load (2022)
62 %reported load/capacity ratio (not hydraulic utilisation)
7th of 124by reported size among the 124 records with a size in the inventory · 2.6 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates42.6420, 27.6605 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Other published data

Mean annual volume treated reported in the 2022 cycle6,223,540 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Bulgaria

Regulatory framework of Bulgaria · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,501,148reference kWh per year for this load
43.4kWh per h-e (average load) per year
675,172€ per year at 0.15 €/kWh
44 %share of energy used for aeration

what this estimate is · Inputs: 138,384 p.e. of reported load; equivalent average load 103,788 p.e. with the reference profile of Bulgaria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

15.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (41,515 m³/day of reference), not measured or available for reclamation.

LOCATION

Bulgaria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Uwwtp Pomorie10.5 km56,62650,182primary, secondary and tertiary
Uwwtp K.K.Elenite12.2 km5,3325,012primary and secondary
Uwwtp Banevo-Vetren-Mineralni Bani (Burgas)22.1 km16,7876,114primary, secondary and tertiary
Uwwtp Burgas24.5 km397,745146,866primary, secondary and tertiary
Kanalizacia Burgas26.0 kmnot reportednot reportednot reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP UWWTP Nesebar-Ravda-Slanchev bryag report?

Reported size: 222,000 h-e design capacity. Received load: 138,384 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of UWWTP Nesebar-Ravda-Slanchev bryag?

Aguas SB simulator reference scenario for 138,384 p.e. of reported load: 4,501,148 kWh per year (43.4 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.