Worldwide wastewater treatment observatory · Croatia

Aguas SB Observatory · public data to understand water

WWTP Belišće

Croatia · official identifier HRUWWTP_0007004_001

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0007004_001 · reported size not reported h-e design capacity · received load 26,835 h-e · data year 2022. nearest inventoried plant at 9.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
26,835h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates45.6751, 18.4068 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,168,018reference kWh per year for this load
43.5kWh per h-e (average load) per year
175,203€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 26,835 p.e. of reported load; equivalent average load 26,835 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (5,367 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Beli Manastir19.1 km8,0009,385primary and secondary
Donji Miholjac21.2 km8,0007,330primary, secondary and tertiary
Osijek27.1 kmnot reported130,120not reported
Kneževi Vinogradi27.3 km2,5001,405primary and secondary
Našice30.0 km15,00013,610primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Belišće report?

Reported size: not reported h-e design capacity. Received load: 26,835 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Belišće?

Aguas SB simulator reference scenario for 26,835 p.e. of reported load: 1,168,018 kWh per year (43.5 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.