Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Donji Miholjac
Croatia · official identifier HRUWWTP_0005001_001
8,000h-e design capacity (2022) · 76th of 115 (tied with 4 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0005001_001 · reported size 8,000 h-e design capacity · received load 7,330 h-e · reported treatment: PST · data year 2022. 76th of 115 records with reported size in the inventory of Croatia (tied with 4 others); 0.18 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 21.2 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 45.7681, 18.1690 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,330 p.e. of reported load; equivalent average load 7,330 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,466 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Belišće | 21.2 km | not reported | 26,835 | not reported |
| Sušine-Đurđenovac | 26.8 km | not reported | 2,201 | not reported |
| Našice | 29.6 km | 15,000 | 13,610 | primary, secondary and tertiary |
| Beli Manastir | 33.6 km | 8,000 | 9,385 | primary and secondary |
| Orahovica | 33.6 km | not reported | 4,431 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Donji Miholjac report?
Reported size: 8,000 h-e design capacity. Received load: 7,330 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Donji Miholjac?
Aguas SB simulator reference scenario for 7,330 p.e. of reported load: 329,994 kWh per year (45.0 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.