Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Davor
Croatia · official identifier HRUWWTP_0006013_001
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0006013_001 · reported size not reported h-e design capacity · received load 1,964 h-e · data year 2022. nearest inventoried plant at 13.6 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.1151, 17.5141 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,964 p.e. of reported load; equivalent average load 1,965 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (393 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Staro Petrovo Selo | 13.6 km | not reported | 505 | not reported |
| Nova Gradiška | 18.0 km | 22,100 | 20,146 | primary, secondary and tertiary |
| Požega | 29.0 km | 33,500 | 20,363 | primary |
| Pleternica | 29.3 km | not reported | 6,777 | not reported |
| Velika | 38.3 km | not reported | 1,299 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Davor report?
Reported size: not reported h-e design capacity. Received load: 1,964 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Davor?
Aguas SB simulator reference scenario for 1,964 p.e. of reported load: 96,895 kWh per year (49.3 kWh per p.e. of average load), with aeration as 68 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.