Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Novy Knin
Czechia · official identifier CZ2107-707635-00242888-4/1U
2,600h-e design capacity (2022) · 515th of 607 (tied with 4 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ2107-707635-00242888-4/1U · reported size 2,600 h-e design capacity · received load 1,568 h-e · reported treatment: PS · data year 2022. 515th of 607 records with reported size in the inventory of Czechia (tied with 4 others); 0.02 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.7833, 14.2832 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,568 p.e. of reported load; equivalent average load 1,573 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (373 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Dobris | 6.8 km | 13,000 | 12,610 | primary and secondary |
| Cov Mnisek Pod Brdy | 9.6 km | 9,750 | 8,001 | primary, secondary and tertiary |
| Cov Stechovice - Masecin | 10.4 km | 550 | 609 | primary and secondary |
| Cov Stechovice | 12.1 km | 2,000 | 840 | primary and secondary |
| Cov Stechovice - Trebenice | 12.4 km | 450 | 182 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Novy Knin report?
Reported size: 2,600 h-e design capacity. Received load: 1,568 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Novy Knin?
Aguas SB simulator reference scenario for 1,568 p.e. of reported load: 84,490 kWh per year (53.7 kWh per p.e. of average load), with aeration as 66 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.