Worldwide wastewater treatment observatory · Denmark
Aguas SB Observatory · public data to understand water
WWTP HUK
Denmark · official identifier DK5130014
52,500h-e design capacity (2022) · 61st of 321
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DK5130014 · reported size 52,500 h-e design capacity · received load 19,893 h-e · reported treatment: PST · data year 2022. 61st of 321 records with reported size in the inventory of Denmark; 0.43 % of the sum of those 321 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.5 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 54.8877, 9.5748 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Denmark
Regulatory framework of Denmark · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 19,893 p.e. of reported load; equivalent average load 19,449 p.e. with the reference profile of Denmark (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (6,207 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Broager Vig | 5.5 km | 10,000 | 6,748 | primary, secondary and tertiary |
| Kollund Renseanlæg | 8.5 km | 10,500 | 2,017 | primary, secondary and tertiary |
| Bov Renseanlæg | 12.6 km | 19,000 | 4,953 | primary, secondary and tertiary |
| Sønderborg Centralrenseanlæg | 13.6 km | 57,000 | 38,480 | primary, secondary and tertiary |
| Stenneskær Renseanlæg | 14.0 km | 6,000 | 2,606 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP HUK report?
Reported size: 52,500 h-e design capacity. Received load: 19,893 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of HUK?
Aguas SB simulator reference scenario for 19,893 p.e. of reported load: 1,039,096 kWh per year (53.4 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.